Its a week, these are on the to do list:
- remove carpet from spare room (methodology - cutting away sections from to get it from under the furniture)
- re-arrange spare room - setting up drawing table, planchests and sofabed
- remove stair and hall carpet
- sand woodwork in hall (bannisters, balastrades, skirting boards, parts of stairs that require painting)
- paint above mentioned woodwork (paint is already purchased)
- finish jacket that is half made (front facings, closures, pockets)
- finish waterproof coat that is a third made (second sleeve, pockets, collar, front facings, lining)
- go to the movies with Pops to watch The Tree of Life
- find a builder to build me a front wall, and possibly same one or a different one to paint the windows and ledges on the outside of hte house, put a downpipe from the guttering on one corner of the house